|Loading...
share-gyan
  • News
  • Analysis
  • Technical
    ShareGyan Logo

    Powering Nepal's Investors with knowledge

    Quick Links

    • Home
    • Partners
    • Privacy Policy
    • Collaboration Request

    Contact us

    Pulchowk, Lalitpur
    info@peridot.com.np
    9851046764,9801462662

    Follow us

    FacebookInstagramTikTokYouTube
    © 2026 Share Gyan Nepal. All Rights Reserved.
    1. Home
    2. /
    3. News
    4. /
    5. Road Collapse Turns 6-Hour Journey into 13-Hour Ordeal
    Published September 8, 2026
    By Share Gyan

    Road Collapse Turns 6-Hour Journey into 13-Hour Ordeal

    The collapse of the Prithvi Highway at Krishnabhir in Dhading has disrupted Lamjung–Kathmandu travel, forcing vehicles onto longer routes and sharply increasing travel time and fares.

    Road Collapse Turns 6-Hour Journey into 13-Hour Ordeal

    Travel between Lamjung and Kathmandu has been disrupted after the Prithvi Highway section at Krishnabhir, Dhading, collapsed on Bhadra 14. Vehicles from Besishahar to Kathmandu are now being diverted through Chitwan, Hetauda, and Dakshinkali, extending the journey from around 5–6 hours to 12–13 hours. The disruption has also reduced transportation services, with daily microbus operations falling from around 40–50 to just 5–7 vehicles. Fares have increased significantly, with diesel microbus fares rising from Rs. 900 to Rs. 2,000 and electric microbus fares from Rs. 700 to Rs. 1,500. Larger buses have also declined from five to six daily departures to just one. The road blockage has created additional difficulties for patients requiring referrals, with some being transported by ambulance via the longer route and others taken to Pokhara before being airlifted by helicopter, increasing both travel and treatment costs.

    Most Recent

    Sep 28, 2026
    SHINE, AHPC & SAPIL Share Prices Adjusted for Bonus Shares

    Share Gyan

    SHINE, AHPC & SAPIL Share Prices Adjusted for Bonus Shares
    Sep 28, 2026
    NEPSE Drops 16.47 Points to Close at 2,613; Turnover Stands at Rs. 5.38 Arba

    Share Gyan

    NEPSE Drops 16.47 Points to Close at 2,613; Turnover Stands at Rs. 5.38 Arba
    Sep 28, 2026
    ANISU (R) Demands Fee Waivers, Hostel Support for Rasuwa Flood-Affected TU Students

    Share Gyan

    ANISU (R) Demands Fee Waivers, Hostel Support for Rasuwa Flood-Affected TU Students
    Sep 28, 2026
    Heavy Rain Disrupts Major Highways Across Nepal, Multiple Routes Blocked

    Share Gyan

    Heavy Rain Disrupts Major Highways Across Nepal, Multiple Routes Blocked
    Sep 28, 2026
    UAIL Lists 9.90 Lakh Bonus Shares on NEPSE

    Share Gyan

    UAIL Lists 9.90 Lakh Bonus Shares on NEPSE
    Sep 28, 2026
    Rhino Cruise Stranded by Narayani Flood, Rescue Operation Underway

    Share Gyan

    Rhino Cruise Stranded by Narayani Flood, Rescue Operation Underway