|Loading...
share-gyan
  • News
  • Analysis
  • Technical
    ShareGyan Logo

    Powering Nepal's Investors with knowledge

    Quick Links

    • Home
    • Partners
    • Privacy Policy
    • Collaboration Request

    Contact us

    Pulchowk, Lalitpur
    info@peridot.com.np
    9851046764,9801462662

    Follow us

    FacebookInstagramTikTokYouTube
    © 2026 Share Gyan Nepal. All Rights Reserved.
    1. Home
    2. /
    3. News
    4. /
    5. Rescue Efforts Intensified for Workers Trapped Inside Trishuli-3A Tunnel
    Published August 30, 2026
    By Share Gyan

    Rescue Efforts Intensified for Workers Trapped Inside Trishuli-3A Tunnel

    Rescue operations have been intensified to save employees and workers trapped inside the Trishuli-3A Hydropower Project tunnel following the devastating floods.

    Rescue Efforts Intensified for Workers Trapped Inside Trishuli-3A Tunnel

    Efforts to rescue employees and workers trapped inside the tunnel of the Trishuli-3A Hydropower Project have been stepped up following the flood disaster. The rescue team is currently attempting to enter the tunnel through the project’s cable outlet tunnel. A joint team comprising technical experts from the Nepal Electricity Authority, the Nepal Army, Armed Police Force and Nepal Police has been deployed at the site. Authorities are working to clear physical structures and other obstructions blocking access to the tunnel. The rescue team has located the upper section, known as the “crown,” of the tunnel and is using an excavator to break through the structure and create an entry route. Officials are preparing to send rescuers inside as soon as a safe passage is established. The rescue operation is being conducted on an emergency basis, with authorities hoping that favorable weather conditions will allow them to determine the situation inside the tunnel and accelerate the rescue of those trapped.

    Most Recent

    Sep 28, 2026
    SHINE, AHPC & SAPIL Share Prices Adjusted for Bonus Shares

    Share Gyan

    SHINE, AHPC & SAPIL Share Prices Adjusted for Bonus Shares
    Sep 28, 2026
    NEPSE Drops 16.47 Points to Close at 2,613; Turnover Stands at Rs. 5.38 Arba

    Share Gyan

    NEPSE Drops 16.47 Points to Close at 2,613; Turnover Stands at Rs. 5.38 Arba
    Sep 28, 2026
    ANISU (R) Demands Fee Waivers, Hostel Support for Rasuwa Flood-Affected TU Students

    Share Gyan

    ANISU (R) Demands Fee Waivers, Hostel Support for Rasuwa Flood-Affected TU Students
    Sep 28, 2026
    Heavy Rain Disrupts Major Highways Across Nepal, Multiple Routes Blocked

    Share Gyan

    Heavy Rain Disrupts Major Highways Across Nepal, Multiple Routes Blocked
    Sep 28, 2026
    UAIL Lists 9.90 Lakh Bonus Shares on NEPSE

    Share Gyan

    UAIL Lists 9.90 Lakh Bonus Shares on NEPSE
    Sep 28, 2026
    Rhino Cruise Stranded by Narayani Flood, Rescue Operation Underway

    Share Gyan

    Rhino Cruise Stranded by Narayani Flood, Rescue Operation Underway